Wednesday, 2 February 2022

Have been updating our kitchen – see all photos here – https://www.curark.com/

Part of our old kitchen about to be removed

Part of our old kitchen about to be removed

Kitchen being dismantled

John surrounded by kitchen cabinets and drawers, all assembled by me. 2 hours to do the first drawer and 2 minutes to do the last.

John surrounded by kitchen cabinets and drawers, all assembled by me. 2 hours to do the first drawer and 2 minutes to the last

Starting to layout the new kitchen

Bench tops ready for fitting and prep and paint the wall

Having a trial run for Chinese New Year eve. Mei busy with the wok. Kitchen is usable, waiting for some doors and some electrical connections. Have installed electric hob with a two burner gas hob alongside.

And a bit of a snack for the Year of the Tiger



from Welcome to Currin Family from Nelson, New Zealand https://ift.tt/8fE17Q5Kt
via IFTTT

No comments:

Post a Comment

John and Mei hope you will leave a message in the comments section. Best wishes everybody from John and Mei